sintec home about products support catalog specials contact

Intraclip Operating Instructions

step 1

1. Fabricate master model.

2. Wax-up framework.

3. Position the extension bar.

step 2

4. Adjust thickness of receiving platform according to occlusal space.

5. Position Intraclip male with surveyor rod.

6. Finish waxing around extension bar.

step 3

7.Complete wax-up.

8. Cast and finish metal framework.

9. Complete ceramic phase.

step 4

10. Place clip in positioning tool.

11. Position clip on male.

12. Verify seating of ring on male.

step 5

13. Insert metal female housing into position.

14. Block out undercuts and provide space around female housing.

15. Proceed to silicon duplication of master model and pour refractory cast.

step 6

16. Complete cast partial wax-up.

17. Cast and finish partial.

18. Reposition on master model.

step 7    

19. Fill inside of female with silicon to prevent acrylic from entering. Connect female to cast partial with self-curing acrylic.

 

Sintec Inc. • 350 Concord Lane • PO Box 129 • E. Wakefield, NH 03830 • 1-800-233-2162
Copyright © 2001-2008 Sintec Inc. All Rights Reserved • Designed and Maintained by EnSky ®